CONSTRUCTION UPDATE

Click here to subscribe to email or text updates about the project.

To view an archive of Construction Updates and find photos of the latest updates, click here.

Feb. 26, 2014 Update
Final design of the project is nearly complete. Construction on this segment is tentatively scheduled to begin in 2014 and continue to the fall of 2015.
2014 South Shady Oak Road Layout (minor changes) [PDF]


Roadway Construction

  • Completion of pavement striping.
  • Installation of signs.
  • Activation of new signal systems.
  • Opening of all lanes to traffic.
Future Construction
  • Painting of retaining wall C under Highway 62 in spring of 2014.

Future Construction South Phase

  • Offline private utility work in summer of 2014.
Traffic Control/Detours
  • None.
 Shady Oak Road Project Location Map

 Shady Oak Road Project Layout

FULL PROJECT SUMMARY
The City of Eden Prairie, in coordination with Hennepin County, MnDOT, and the City of Minnetonka, is improving Shady Oak Road (County Road 61) between and including the interchanges of Highway 62 and Highway 212. The project will add turn lanes, a median and trails along Shady Oak Road, and will be constructed in multiple phases which are described below.
Project Summary Graphic [PDF] 

The proposed improvements to Shady Oak Road have been identified in both the City of Eden Prairie’s and Hennepin County’s Capital Improvement Plans. The catalyst for implementing the project at this time is the proposed UnitedHealth Group (UHG) development on the east side of Shady Oak Road. The improvements to Shady Oak Road were based on a UHG traffic study [PDF] conducted as part of the development process. The completion of the northern phase of the Shady Oak Road improvements is being scheduled to coincide with the initial phase of the UHG development.

NORTH SHADY OAK ROAD
The north phase of the project included the full reconstruction of Shady Oak Road from approximately 800 feet north of Rowland Road extending northerly through the Highway 62 interchange. The improvements will provide additional capacity along Shady Oak Road and at the City West Parkway (Old Shady Oak Road), Highway 62 South Ramp (West 62nd Street) and Highway 62 North Ramp intersections. The project included new traffic signals at each of these intersections as well as new multi-use trails along both sides of Shady Oak Road.
North Shady Oak Road Layout [PDF]
North Shady Oak Road Streetscape Plan [PDF]
August 2012 North Shady Oak Road Open House Information [PDF]
January 2013 North Shady Oak Road Open House Information [PDF]

This north phase of the project also included improvements to City West Parkway just east of Shady Oak Road across from Old Shady Oak Road. These improvements include a roundabout at the south intersection of the UHG access road, now named Optum Way.
City West Parkway Roundabout Plan [PDF]

Construction on the north phase of the project began October 2012 and was substantially complete in November 2013. Max Steininger, Inc. was selected as the prime contractor and is responsible for completing all construction work. Visit this page often for regular construction updates.

SOUTH SHADY OAK ROAD
The south phase of the Shady Oak Road improvements includes the full reconstruction of Shady Oak Road from the intersection of Flying Cloud Drive to the limits of the north phase (800 feet north of Rowland Road). The improvements will provide additional capacity along Shady Oak Road, including a new expanded bridge over Highway 212. As with the north project, multi-use trails will be provided along both sides of Shady Oak Road.

Preliminary engineering work for this phase of the project is completed and a detailed project layout has been fully developed. A public hearing with the Eden Prairie City Council was held March 5, 2013 and the layout was approved. Click here to view the public hearing presentation [PDF].

March 5 2013 City Council Presentation [PDF]
Council Approved South Shady Oak Road Layout [PDF]
South Shady Oak Road Streetscape Plan [PDF]
August 2012 South Shady Oak Road Open House Information [PDF]
January 2013 South Shady Oak Road Open House Information [PDF]

WEST 62ND STREET
In order to accommodate the UHG development, future improvements are also planned along West 62nd Street. The West 62nd Street improvements include the full reconstruction of the roadway and a multi-use trail along the south side of the roadway. At this time, there is no specific schedule for the construction of the eastern segment of the West 62nd Street Improvements, however, this improvement is planned to be constructed concurrent with the third phase of UHG development.

Project Contact
Carter Schulze
, PE
Senior Project Engineer
952-949-8360

For More Information
Use this contact information to provide feedback or request more information.
952-279-8000
info@shadyoakroad.com

RELATED INFORMATION

Roundabout Information

January 2013 Shady Oak Road Open House Flyer [PDF]

South Shady Oak Road Public Hearing Notice [PDF]

Free viewers are required for some of the attached documents.